- Industry District Court
- Construction area Total capacity of electrical equipment: 6060.69KVA
- Contracted project ■ High-voltage electrical equipment engineering ■ Low-voltage distribution box equipment engineering ■ Lighting electrical equipment engineering ■ Weak-current and grounding equipment engineering ■ Emergency generator equipment engineering ■ Floor cable trough equipment engineering ■ Emergency broadcast audio equipment engineering ■ Water supply and drainage equipment engineering ■ Ventilation and smoke exhaust equipment engineering ■ Fire alarm equipment engineering
- Case location No. 1151, Zhongzheng Road, Gongjing Village, Miaoli City
- Project Overview:
New Hydropower Project - Project Duration:
09/07/1982 to 09/01/1986 - Contracting Systems:
■ High Voltage Electrical Equipment Project
■ Low Voltage Distribution Box Equipment Project
■ Lighting Electrical Equipment Project
■ Weak Current and Grounding Equipment Project
■ Emergency Generator Equipment Project
■ Floor Trunking Equipment Project
■ Emergency Broadcasting Audio Equipment Project
■ Water Supply and Drainage Sanitary Equipment Project
■ Ventilation and Smoke Exhaust Equipment Project
■ Fire Alarm and Firefighting Equipment Project