A New Era

BIM Empowers Project Management
Leading a New Era in Architecture

Since 2012, Jiuhan  has adopted BIM technology, using 3D digital models to improve construction quality, reduce costs, and optimize progress. From planning, design, construction, maintenance, renovation to demolition, BIM leads us into a new realm of intelligent building management.
bim 經驗
Build Life Cycle

Engineering Services Throughout the Building Life Cycle

Collaborative Quality Management
Digital integration reduces errors and conflicts. Through 3D modeling, SEM and CSD drawing integration resolves traditional 2D design information silos, enhancing cross-disciplinary collaboration. By visualizing designs and conflict detection, construction rework is minimized, ensuring project quality and efficiency.
Optimized Cost Control
LOD400 to LOD500 models accurately calculate material quantities, reducing budgeting errors and lowering construction costs. Through BIM, pipeline and equipment layouts are optimized to eliminate unnecessary construction expenses, improve energy efficiency, and implement modular MEP (Mechanical, Electrical, Plumbing) design, thereby reducing on-site labor and time costs.
Progress Management Optimization
By using 4D simulation to integrate 3D models with construction schedules, the construction process can be dynamically simulated. This enables proactive planning of workflows and construction sequences, enhancing schedule control capabilities.
Enhanced Safety Management
Using BIM to simulate crane radius, safety factors, construction paths, and hazardous zones helps reduce on-site risks and supports safety training, enhancing workers’ safety awareness.
Process Flowchart

BIM Implementation Process

01
Assign BIM Team Responsibilities
02
Clarify Work Interfaces and Resolve Issues
03
Establish MEP Template Files for the Project
04
Create Initial Model
05
Conduct Clash Detection
06
Optimize the Model
07
Generate Drawings and Submit for Review
08
Construction and Model Fine-tuning
09
Final As-built Model
01 09
Application Results

BIM Application Cases

We use cookies to enable the proper functioning of our website, personalize content and ads, provide social media features, and analyze traffic. We also share information about your use of our site with our social media, advertising, and analytics partners.

Manage Cookies

Privacy preferences

We use cookies to enable the proper functioning of our website, personalize content and ads, provide social media features, and analyze traffic. We also share information about your use of our site with our social media, advertising, and analytics partners.

Privacy Policy

Manage preferences

Necessary cookie

Always on

The website cannot function properly without these cookies, and you cannot disable them in our system. They are typically set in response to actions made by you, such as requests for services like setting your privacy preferences, logging in, or filling out forms. You can set your browser to block or alert you about these cookies, but some parts of the site may not work as a result.