National Yang Ming Chiao Tung University
- Industry Educational and Academic Institutions
- Construction area The total capacity of electrical equipment is 6,060.69 KVA.
- Contracted project High-voltage switch station and external pipeline works, High- and low-voltage equipment works, Switchgear equipment works, Generator equipment works, Electrical equipment and wiring works, Low-current equipment and wiring works, Fire protection equipment and piping works, Air conditioning works
- Case location 新竹市大學路1001號
- Project Overview:
New Construction of Basic Science Teaching and Research Building - Total Electrical Capacity 6060.69KVA - Project Duration:
January 17, 2010 ~ March 12, 2012 - Contracted Systems:
■High Voltage Switch Station and External Pipeline Engineering
■High and Low Voltage Equipment Engineering
■Switch Box Equipment Engineering
■Generator Equipment Engineering
■Electrical Equipment and Pipeline Engineering
■Low-voltage equipment and pipeline engineering
■Fire protection equipment and piping engineering
■Air conditioning engineering