- Industry Other industries
- Contracted project A. Electrical Engineering, B. Air Conditioning Engineering
- Case location No. 12, Zhongzheng Road, Jingxiu Road, Zhongshan Road, Yuanlin Township, Changhua County
- Project Overview:
New Construction of Hydroelectric Air Conditioning Project - Project Duration:
April 11, 1994 to October 25, 1996 - Scopes Undertaken:
A.Electrical Engineering
■ High and Low Voltage Equipment Engineering: Power System
■ 2680KVA, 3Φ3W11.4KV Power Supply
■ Switchgear Equipment Engineering
■ Taipower Receiving Room and Generator Equipment Engineering
■ Electrical Equipment and Wiring Engineering
■ Sanitary Equipment and Piping Engineering
■ Weak Current Equipment and Wiring Engineering
■ Fire Protection Equipment and Piping Engineering
■ Floor Duct & Copper Busbar Engineering
■ Septic Tank Equipment Engineering
■ Anti-theft, Surveillance, Broadcast, and Conference Room Equipment Engineering - B.Air Conditioning Engineering
■ Ice Storage Equipment Engineering: 1350RT-HR
■ Duct Engineering
■ Plumbing Engineering
■ Power Distribution Engineering
■ Central Monitoring and Automation Engineering