- Industry Integrated Circuit (IC) Wafer Foundry
- Construction area Class 10(443 ㎡ )、 Class 100(215 ㎡) 、Class 1000(450 ㎡)
- Contracted project A. Cleanroom and Air Conditioning Engineering, B. New Low-Voltage Power Distribution Electrical Engineering, C. Facility Renovation, Plumbing, Electrical, and Fire Protection Engineering.
- Case location No. 12, Yanxin 4th Road, Hsinchu Science Park, Hsinchu, Taiwan
- Project Overview:
Construction of New Cleanrooms at R&D Factory 2 - Class 10 (443㎡), Class 100 (215㎡), Class 1000 (450㎡) - Project Duration:
11th November 2006 to 22nd March 2007
Contracted Systems:
A. Cleanroom and Air Conditioning Engineering
- Interior Finishing Facilities
- Cleanroom Equipment
- Air Conditioning Facility Engineering
- Waste Exhaust Engineering
- Air Conditioning Electrical Engineering
- Automatic Control Engineering - B. Electrical Installation of New Low-Voltage Distribution Engineering
- Cabinet Equipment Engineering
- Installation of Electrical Main Lines
- Pipeline Installation Engineering below the Power Distribution Box
- Lighting, Socket, and Pipeline Installation Engineering below the Distribution Box - C. Factory Renovation Water, Electrical, and Firefighting Engineering
- Fire Alarm Equipment Engineering
- Firefighting Equipment Engineering
- Evacuation and Signage Equipment Engineering
- Sprinkler Equipment Engineering
- Broadcasting Equipment Engineering