- Industry Ceramics and ceramic products manufacturing industry
- Contracted project Electrical Equipment Engineering (22.8KV High Voltage Power Supply, Equipment Capacity 1250KVA), Low Voltage Equipment Engineering, Plumbing and Sanitary Equipment Engineering, Fire Protection Equipment Engineering, Central Air Conditioning System (Chilled Water Unit 140RT × 2 Units)
- Case location No. 12, Lixing Road, Hsinchu Science Park, Hsinchu City, Taiwan
- Project Overview:
Construction of New Electrical and Mechanical Engineering in Zhunan Office Building - Project Duration:
Jan 5, 2010 to Dec 30, 2011 - Contracted Systems:
■ Electrical Equipment Engineering "22.8KV High-voltage Power Supply, Equipment Capacity 1250KVA"
■ Low Voltage Electrical Equipment Engineering
■ Plumbing and Sanitary Equipment Engineering
■ Fire Protection Equipment Engineering
■ Central Air Conditioning System "Chiller Mainframe 140RT×2 units"