Formosa AdvEnergy Technology Corporation
Formosa Advanced Energy Corp- Industry Semiconductor Manufacturing Industry
- Contracted project MEP General Contracting Project
- Case location Lunwei Changbin Industrial Park, Changhua County, Taiwan
Engineering Contents:
- The process and utility equipment supplied by Party A and materials provided by Party B(Including equipment supplier's material piping, insulation installation, and onsite modifications)Fixing and security(assembly)installation
- Clean room/Partition and interior works of the drying room
- Air conditioning system engineering3.1.1.4 Firefighting system(Including smoke exhaust)engineering(Coordination with construction upon approval of the five major pipeline changes)
- Process Exhaust System Engineering(NMPEquipment is managed by Party A, and Party B includes ductwork engineering, interfacing up to the rooftop pipeline area.)
- General Water Supply and Drainage System Engineering(Excludes domestic drainage and rainwater pipeline embedding works)
- Process and Utility Chilled Water and Cooling Water System Engineering
Project Duration:112.10.02~113.07.31
Contract Systems:
- Electrical Engineering
- Compressed Air System Engineering
- Ultrapure Water Treatment System Engineering
- Wastewater Treatment System Engineering
- Process Vacuum System Engineering
- Central Dust Collection System Engineering
- Gas Supply System Engineering
- Electrolyte(Including Equipment)Piping System Engineering
- Central Monitoring System Engineering